Gregor Control (ATC-06): Difference between revisions
update status |
m Repoint order/directive links to the Orders namespace |
||
| (One intermediate revision by one other user not shown) | |||
| Line 20: | Line 20: | ||
==History== | ==History== | ||
Gregor Control was commissioned on 19 Sept 2019 under the command of then-CAPT Clark by order of BuShips. ATC-06 was the second RMACS station to be commissioned. It was decommissioned 8 March 2022.<ref>[[BuShips Directive 2203-02]]</ref> | Gregor Control was commissioned on 19 Sept 2019<ref>[[Orders:BuShips Directive 1909-06]]</ref> under the command of then-CAPT Clark by order of BuShips. ATC-06 was the second RMACS station to be commissioned. It was decommissioned 8 March 2022.<ref>[[Orders:BuShips Directive 2203-02]]</ref> | ||
===Commanding Officers=== | ===Commanding Officers=== | ||