HMLAC Browncoat (LAC-033): Difference between revisions

m Repoint order/directive links to the Orders namespace
m Repoint order/directive references to the Orders namespace
Line 20: Line 20:


==History==
==History==
''Browncoat'' was commissioned on 6 October 2019 under the command of [[LTSG]] Richard DeShong.<ref>[[Eighth Fleet Order 1910-A]]</ref>  The ‘’Browncoat’’ was assigned to patrol Tempe, AZ.  
''Browncoat'' was commissioned on 6 October 2019 under the command of [[LTSG]] Richard DeShong.<ref>[[Orders:Eighth Fleet Order 1910-A]]</ref>  The ‘’Browncoat’’ was assigned to patrol Tempe, AZ.  


The ''Browncoat'' had  {{hms|Cyclops|CLAC-11}} (CLAC-11) as its parent ship.  
The ''Browncoat'' had  {{hms|Cyclops|CLAC-11}} (CLAC-11) as its parent ship.  


On 28 February 2020, ''Browncoat'' was transferred to the Active Reserves with the commissioning of {{hms|Tornado|DD-488|hcn}}.<ref>[[Orders:BuShips Directive 2002-08]]</ref>
On 28 February 2020, ''Browncoat'' was transferred to the Active Reserves with the commissioning of {{hms|Tornado|DD-488|hcn}}.<ref>[[Orders:Orders:BuShips Directive 2002-08]]</ref>