HMLAC Browncoat (LAC-033): Difference between revisions
m Repoint order/directive links to the Orders namespace |
m Repoint order/directive references to the Orders namespace |
||
| Line 20: | Line 20: | ||
==History== | ==History== | ||
''Browncoat'' was commissioned on 6 October 2019 under the command of [[LTSG]] Richard DeShong.<ref>[[Eighth Fleet Order 1910-A]]</ref> The ‘’Browncoat’’ was assigned to patrol Tempe, AZ. | ''Browncoat'' was commissioned on 6 October 2019 under the command of [[LTSG]] Richard DeShong.<ref>[[Orders:Eighth Fleet Order 1910-A]]</ref> The ‘’Browncoat’’ was assigned to patrol Tempe, AZ. | ||
The ''Browncoat'' had {{hms|Cyclops|CLAC-11}} (CLAC-11) as its parent ship. | The ''Browncoat'' had {{hms|Cyclops|CLAC-11}} (CLAC-11) as its parent ship. | ||
On 28 February 2020, ''Browncoat'' was transferred to the Active Reserves with the commissioning of {{hms|Tornado|DD-488|hcn}}.<ref>[[Orders:BuShips Directive 2002-08]]</ref> | On 28 February 2020, ''Browncoat'' was transferred to the Active Reserves with the commissioning of {{hms|Tornado|DD-488|hcn}}.<ref>[[Orders:Orders:BuShips Directive 2002-08]]</ref> | ||